Energy
Greece: distribution-connected batteries to receive connection terms ahead of transmission-linked units
900 MW is earmarked for standalone batteries on the distribution network; 560 applications totalling 1.6 GW have been submitted, and connection terms for the full portfolio could be granted by spring 2027.
Source: energypress.eu · dated